ACTIVES | |||||
Technology | Manufacturer | Current Lead-Times | Lead-Times Trend | Comments | |
Diodes Inc | 12-24 | Increasing | Schottky rectifiers SOT23 and SOD323 20- 24 weeks, PDI123 21 weeks, SBR TO220AB 12-20 weeks, SMA 16-18 weeks. | ||
Vishay | 16-52 | Increasing | There are increased lead times in SMA, SMB, SMC, TO-220, TO-263 and DPAK. Schottkys are most affected with 40-52 weeks lead time. | ||
ON Semiconductor | 18-42 | Increasing | SOD123 flat lead, SOT23 copper and SMA Flat lead 36-42 weeks lead time. Automotive parts 26-32 weeks | ||
STMicroelectronics | 20-33 | Increasing | TURBO 2 Ultrafast High Voltage Rectifiers running about 20 weeks. Everything else is 25-33 weeks. | ||
Fairchild | 12-14 | Stable | | ||
Diodes Inc | 12-16 | Increasing | | ||
Littelfuse | 16 | Increasing | Purchased ON Semi TVS business Lead times 24 weeks | ||
Vishay | 25-40 | Increasing | SMC at 25 weeks SMA and SMB at 40 | ||
STMicroelectronics | 8 | Stable | | ||
Diodes Inc | 12-22 | Increasing | | ||
Nexperia | 20-40 | Increasing | SOT23SD/DD from 20 to 45 weeks - SOD523 from 40 weeks - - SOT 89 40 WEEKS - SOT323SD/DD from 40 weeks SOT363 from 30 to 40 weeks SOT353P 20-40 WEEKS SOD123F 30 WEEKS DHVQFN14/16/20/24 from 12 to 24 weeks – DFN PACKAGES 20 weeks – SOD 323 26 WEEKS – SOT 223 40 WEEKS – DSN PACKAFES 20 WEEKS | ||
ON Semiconductor | 20-40 | Increasing | SMA 23-40 WEEKS – SMB 23-40 WEEKS – SMC 28-33 WEEKS – SOT 23 COPPER 20-45 WEEKS – SOT 89 16-30 WEEKS – SOT223 40 WEEKS – TO220 16-22 WEEKS – SOD 923 18-22 WEEKS – SOIC-8-14-16 20-30 WEEKS – SOD123 COPPER 20-30 WEEKS – SOD 323 DPAK 20-30 WEEKS – DFN PACK 20-52 WEEKS – SC 70 18-30 WEEKS | ||
Fairchild | 16-45 | Increasing | | ||
Switching Diodes | Diodes Inc | 12-22 | Increasing | | |
Fairchild | 16-45 | Increasing | | ||
ON Semiconductor | 16-40 | Increasing | SMA 23-40 WEEKS – SMB 23-40 WEEKS – SMC 28-33 WEEKS – SOT 23 COPPER 20-45 WEEKS – SOT 89 16-30 WEEKS – SOT223 40 WEEKS – TO220 16-22 WEEKS – SOD 923 18-22 WEEKS – SOIC-8-14-16 20-30 WEEKS – SOD123 COPPER 20-30 WEEKS – SOD 323 DPAK 20-30 WEEKS – DFN PACK 20-52 WEEKS – SC 70 18-30 WEEKS | ||
Nexperia | 20-40 | Increasing | SOT23SD/DD from 20 to 45 weeks - SOD523 from 40 weeks - - SOT 89 40 WEEKS - SOT323SD/DD from 40 weeks SOT363 from 30 to 40 weeks SOT353P 20-40 WEEKS SOD123F 30 WEEKS DHVQFN14/16/20/24 from 12 to 24 weeks – DFN PACKAGES 20 weeks – SOD 323 26 WEEKS – SOT 223 40 WEEKS – DSN PACKAFES 20 WEEKS | ||
Zener Diodes | Diodes Inc | 12-22 | Increasing | | |
Fairchild | 10-30 | Increasing | | ||
Nexperia | 6-40 | Increasing | SOT23SD/DD from 20 to 45 weeks - SOD523 from 40 weeks - - SOT 89 40 WEEKS - SOT323SD/DD from 40 weeks SOT363 from 30 to 40 weeks SOT353P 20-40 WEEKS SOD123F 30 WEEKS DHVQFN14/16/20/24 from 12 to 24 weeks – DFN PACKAGES 20 weeks – SOD 323 26 WEEKS – SOT 223 40 WEEKS – DSN PACKAFES 20 WEEKS | ||
ON Semiconductor | 12-40 | Increasing | SMA 23-40 WEEKS – SMB 23-40 WEEKS – SMC 28-33 WEEKS – SOT 23 COPPER 20-45 WEEKS – SOT 89 16-30 WEEKS – SOT223 40 WEEKS – TO220 16-22 WEEKS – SOD 923 18-22 WEEKS – SOIC-8-14-16 20-30 WEEKS – SOD123 COPPER 20-30 WEEKS – SOD 323 DPAK 20-30 WEEKS – DFN PACK 20-52 WEEKS – SC 70 18-30 WEEKS | ||
Vishay | 12-44 | Increasing | SMA SMB - 28-44 WEEKS | ||
Diodes Inc | 16-30 | Increasing | DFxx series 25-30 weeks, KBPxx series 21-25 weeks. | ||
Fairchild | 12-42 | Increasing | | ||
Vishay | 19-45 | Increasing | | ||
Diodes Inc | 12-22 | Increasing | | ||
Fairchild | 10-40 | Increasing | | ||
Nexperia | 13-40 | Increasing | SOT23SD/DD from 20 to 45 weeks - SOD523 from 40 weeks - - SOT 89 40 WEEKS - SOT323SD/DD from 40 weeks SOT363 from 30 to 40 weeks SOT353P 20-40 WEEKS SOD123F 30 WEEKS DHVQFN14/16/20/24 from 12 to 24 weeks – DFN PACKAGES 20 weeks – SOD 323 26 WEEKS – SOT 223 40 WEEKS – DSN PACKAFES 20 WEEKS | ||
ON Semiconductor | 12-40 | Increasing | SMA 23-40 WEEKS – SMB 23-40 WEEKS – SMC 28-33 WEEKS – SOT 23 COPPER 20-45 WEEKS – SOT 89 16-30 WEEKS – SOT223 40 WEEKS – TO220 16-22 WEEKS – SOD 923 18-22 WEEKS – SOIC-8-14-16 20-30 WEEKS – SOD123 COPPER 20-30 WEEKS – SOD 323 DPAK 20-30 WEEKS – DFN PACK 20-52 WEEKS – SC 70 18-30 WEEKS | ||
Rohm Semiconductor | 10-60 | Increasing | The following packages have been extended to 40 weeks CPT - TSMT356 - TSMT36M - TSMT8 - TSMT8M - SOP8 - UMD2M - USM - EMD2M - EMD2 - TUSH/TUMD2S - PMDU - PMDUM – PSM – PMDS - SSOP5 - SSOP6 | ||
PASSIVES | |||||
Trimmers & Pots | BI Tech | 8-12 | Stable | | |
Piher | 10-14 | Stable | | ||
Panasonic | 14-16 | Decreasing | Pots will be EOL by the end of 2017 | ||
Vishay | 10-14 | Stable | | ||
NIC Components | 18-20 | Increasing | Leadtimes pushed out. Some pricing has been increased. Pushouts some cases 40 weeks | ||
Nichion | 18-28 | Stable | SMD 10x10,8x10,6.3x7.7 Leadtimes coming down now between 18-24, Snap-in still 28-30, price increases happening | ||
Surge | 14-19 | Increasing | Lead-times pushing out closing on 20 weeks on some products | ||
Panasonic | 14-18 | Decreasing | Some SMD dropping from 18 to 16 weeks. Some price increases. | ||
United Chemicon | 16-20 | Increasing | Leadtimes increasing the 18-20 weeks | ||
AVX | 20-28 | Increasing | Long lead-times across all case sizes | ||
Vishay | 15-20 | Increasing | Lead-times extending on small case sizes A & B | ||
Leaded Capacitors - Ceramic | AVX | 18-20 | Stable | | |
Murata | 18-20 | Stable | A lot of parts EOL'd | ||
Vishay | 12-16 | Stable | | ||
NIC Components | 14-18 | Increasing | | ||
TDK | 14-20 | Increasing | | ||
Surface Mount General Capacitors – Ceramic | AVX | 24+ | Increasing | Automotive Specs Sold Out, Allocation on 44 series of parts. Controlled order entry on long list of parts | |
Murata | 20-38+ | Increasing | Controlled order entry on a long list of parts, mostly large case sizes. EOL notification on many parts | ||
Samsung | 24+ | Increasing | Lead times under pressure, price increases in Q1 2018 | ||
TDK | 24+ | Increasing | On severe allocation | ||
Taiyo Yuden | 30+ | Increasing | On severe allocation | ||
NIC Components | 24+ | Increasing | | ||
Yageo | 38+ | Increasing | Price increase in Q1 2018, Controlled order entry on long list of parts | ||
Walsin | 40+ | Increasing | | ||
Vishay | 16+ | Stable | |
Kt Kingtronics Snap-in, Lug and Screw Type Aluminum Electrolytic Capacitors Application (2018-7-12 16:15:26)
Kt Kingtronics SMAF Package at the Best Offer – Diode M7F (2018-7-10 10:1:15)
Kt Kingtronics Axial Type Aluminum Electrolytic Capacitors Application (2018-7-3 17:16:44)
Kt Kingtronics Radial Type Aluminum Electrolytic Capacitors Application (2018-6-28 14:26:38)
Kt Kingtronics Electronica 2018 Munich Germany Invitation: Booth No. A1-556-5 (2018-6-26 9:45:13)
◎welcome to give out your point。
Tel: (86) 769 8118 8110
Tel: (852) 8106 7033
Fax: (852) 8106 7099
E-mail: info@kingtronics.com
Skype: kingtronics.sales
MSN: kingtronics-sales@hotmail.com
Web: www.Kingtronics.com
Kingtronics International Company was established in 1995 located in Dongguan City of China to handle all sales & marketing for factories located in Chengdu, Sichuan and Zhaoqing, Guangdong, China. In 1990, we established the first factory to produce trimming potentiometer and in 1999 we built up new factory in Zhao Qing, Guangdong. Now with around 850 workers, Kingtronics produce trimming potentiometers, dipped tantalum capacitors, multilayer ceramic capacitors, and diode & bridge rectifier. We sell good quality under our brand Kingtronics, and Kt, King, Kingtronics are our three trademarks. All our products are RoHS compliant, and our bridge rectifier have UL approval. Please visit our Products page, you could please download all our PDF datasheet and find cross reference for our Trimming Potentiometer and capacitors.
Tantalum and Ceramic Capacitors Cross Reference ↓ Download
Diodes & Rectifiers List(PDF: 97KB) ↓ Download
Trimming Potentiometer Cross Reference ↓Download
0Commentary - Kt Kingtronics File Global Lead Time Information in Electronics Industry