Kingtronics provides a stable and good quality Ceramic Trimmer Capacitors with good lead time.
Although Murata stop offer TZC3 series, but with Kingtronics 3MM Ceramic Trimmer Capacitors (KKT series) you do not need to worry about it.
Welcome for any inquiry.
Features
*Low capacitance drift
*High durability from vibration, dust, moisture and flux
*Color coded case permits easy identification
*Very good Q and high resonant frequency
*Designed for reflow soldering.
*Small size with external dimension of 3.2(W) x 4.5(L) x 1.5(T) mm
Applications
*Remote Keyless Entry System, Measuring Instrument
*Car Alarm Remote Controller, Car Audio, Traffic Card Reader
*Security System, Wireless Microphone
*Cordless Phone, Wireless Repeater
*Two-Way Radio Communication (FRS, GMRS, LMR)
*TCXO, VCXO, RF Module, RFID, DVD
Product Video: https://www.youtube.com/watch?v=Men9BCDlODk
Lead Time: Regular stock ~ 4 weeks
Cross reference for Kingtronics and Murata P/N
Kingtronics P/N | Murata P/N | Capacitance (pF MAX) |
KKT303TR (Black) | TZC3Z030 (Brown, Black) | 3pF |
KKT306TR (Blue) | TZC3Z060 (Blue, Black) | 6pF |
KKT310TR (Ivory) | TZC3Z100 (White, Black) | 10pF |
KKT320TR (Pink) | TZC3Z200 (Red, Black) | 20pF |
KKT330TR (Green) | TZC3Z300 (Green, Black) | 30pF |
As you know, there are few factory currently produce Super Capacitors in China because of Technical equipment or professionals.
Kingtronics Super Capacitors offer high reliability, high power, low ESR, and ultra-high capacitance energy storage utilizing proprietary, environmentally friendly materials and processes.
These ultra-capacitors are tailored for applications for backup power, pulse power, distribution micro grid, Medical devices and Energy harvesting.
It is learnt that AVX tantalum capacitor F93 series will move the factory to North America in 2020.
It will cause extremely long lead time for this series.
Kingtronics | Description | AVX | KEMET | VISHAY | Panasonic | China |
CKT | Chip Tantalum Capacitors | F93 | T491 | 293D | TE(ECST) | CA45 |
PKT | Solid Polymer Tantalum Capacitors | TCJ | T520 | T55 | … | CA55 |
EKT | Low ESR Chip Tantalum Capacitors | TPS | T495 | 593D | … | … |
TKT | Radial Epoxy Dipped | TAP | T350~T390 | … | ECSF | CA42 |
CAPACITORS-POLYMER TANTALUM | ||
MANUFACTURER | CURRENT LEAD-TIMES (weeks) | LEAD-TIMES TREND |
AVX | 14 | Increasing |
Panasonic | 12 | Stable |
Vishay | 12 | Stable |
Kingtronics | 5-7 | Stable |
Are you looking for Tantalum Capacitors and Aluminum Electrolytic Capacitor ?
Kingtronics produces various capacitors professionally for about 30+ years with ISO & RoHS Certified.
Following are our promotional items with excellent price and lead time support, welcome share your inquiry with us to check and quote you best.
Kingtronics Kt SMD Type Aluminum Electrolytic Capacitors Factory https://www.youtube.com/watch?v=ZpMf5VRjjFU&t=1s
Kingtronics MLCC Multilayer Ceramic Capacitors Factory https://www.youtube.com/watch?v=7J2jbfXuoc4
TKT--Dipped tantalum capacitor | Kingtronics P/N | Lead Time |
1uF 35V +/-20% Pitch: 2.54mm Bulk RoHS | TKT010M3502BR | 5-9 weeks |
10uF 25V +/-20% Pitch: 2.54mm Bulk RoHS | TKT100M2502BR | |
22uF 25V +/-20% P: 2.54mm Bulk RoHS | TKT220M2502BR |
CKT-Chip tantalum capacitor | Kingtronics P/N | Lead Time |
4.7uF 10V +/-20% A Case T&R RoHS | CKT4R7M160ATR | 2-5 weeks |
3.3uF 6.3V +/-20% B Case T&R RoHS | CKT3R3M060BTR | |
15uF 6.3V +/-20% C Case T&R RoHS | CKT150M060CTR |
GKT-VT Series SMD Aluminum Electrolytic Capacitors | Size | Lead Time |
4 x 5.4mm | 4-8 weeks | |
5 x 5.4mm | ||
5 x 5.8mm |
As a popular brand serving global market over 3 decades, we are firmly confident on providing professional cost-effective solutions.
Especially on Aluminum Electrolytic Capacitor scape, we perform our duties as a trustworthy partner in maximizing the most of profit for worldwide customers, as well as offer cutting-edge technology products.
Customers with orders on hand enjoys the highest priority, meanwhile everyone is equal when seeking our support under closer negotiation.
The more business information customers are willing to share, the better cooperation we can achieve.
Open heart. Joint efforts. Count on each other. More prosperous future is within our control.
Kingtronics Aluminum Electrolytic Capacitor Factory https://youtu.be/KlUnsCwQC3Y
Kingtronics Kt SMD Type Aluminum Electrolytic Capacitors Factory https://www.youtube.com/watch?v=ZpMf5VRjjFU&t=1s
Kingtronics Kt Radial Aluminum Electrolytic Capacitors Manufacturing Process https://youtu.be/o3bQ4Vj_33A
Kingtronics SMD ECAP can make replacement for following Brand with more excellent lead time and price!
Kindly share your inquiry with us to help you cost down, welcome contact us for more information.
Ecap website: http://www.ecap.hk/
Kingtronics Aluminum Electrolytic Capacitor Factory: https://www.youtube.com/watch?v=QEPG2WRuHsk
Cross ref.: http://www.ecap.hk/download/Kingtronics-SMD-Aluminum-Electrolytic-Capacitors-Cross-Reference.html
Aluminum Electrolytic Capacitors - SMD Type | |||||
Kingtronics P/N | Characteristic | Nichicon | Samwha | Rubycon | CHEMI-CON |
GKT-VA | 85°C 2000Hr~3000Hr | UWX | SC | SEV | MVA |
GKT-VT | 105°C 1000H~2000H | UWT | RC | SKV | MVE |
GKT-VE | 105°C 2000H-3000H | UA | JM | SJV | MVL |
GKT-VK | 105°C 2000H-3000H | UD | CM | MLA | |
Extra Lower Impedance | |||||
GKT-VL | 105°C 3000H-5000H | UL | CA | SLV, SGV | MLK, MVL |
GKT-VZ | 105°C 1000H-2000H | WF | CK | TZV | MZA, MVY |
Low Impedance |
Through years efforts, we have been working on not only best quality but also competitive offer for our valued customers~
Below you can find our faster lead time in global electronic market for our Trimmers. Feel free to have a try !
Please let us know if there is any scope to work together in coming New Year !
“oh… when can the lead time of MLCC issues be settled…” will be a problem you can forget about.
Here I’d like to share and recommend Radial MLCC ceramic capacitors to you.
Kingtronics can offer Radial MLCC with below competitive lead time in stable 3-5 weeks !
Please let us know if you have any request and we are eager to help and support !
Technology | Manufacturer | Current Lead Time(weeks) | Lead Times Trend |
Leaded Capacitors - Ceramic | AVX | 18-20 | Stable |
Murata | 18-20 | Stable | |
Vishay | 12-16 | Stable | |
NIC Components | 14-18 | Increasing | |
TDK | 14-20 | Increasing | |
Kingtronics | 3-5 | Stable |
Did your suppliers of aluminum electrolytic capacitors inform that price and L/T will increase much more in near future?
Kingtronics can offer you stable price and shorter L/T than those top suppliers as below. Our lead time is only about 5-9 weeks.
We can also discuss more at Electronica 2018 in Munich. Do you have plan for it?
Technology | Manufacturer | Lead-Times | Lead-Times Trend | Comments |
Electrolytic Capacitors | NIC Components | 18-20 | Increasing | L/T pushed out. Some pricing has been increased. Pushouts some cases 40 weeks |
Nichion | 18-28 | Stable | SMD 10x10,8x10,6.3x7.7 L/T coming down now between 18-24, Snap-in still 28-30, price increases happening | |
Surge | 14-19 | Increasing | Lead-times pushing out closing on 20 weeks on some products | |
Panasonic | 14-18 | Decreasing | Some SMD dropping from 18 to 16 weeks. Some price increases. | |
United Chemicon | 16-20 | Increasing | L/T increasing the 18-20 weeks |
ACTIVES | |||||
Technology | Manufacturer | Current Lead-Times | Lead-Times Trend | Comments | |
Diodes Inc | 12-24 | Increasing | Schottky rectifiers SOT23 and SOD323 20- 24 weeks, PDI123 21 weeks, SBR TO220AB 12-20 weeks, SMA 16-18 weeks. | ||
Vishay | 16-52 | Increasing | There are increased lead times in SMA, SMB, SMC, TO-220, TO-263 and DPAK. Schottkys are most affected with 40-52 weeks lead time. | ||
ON Semiconductor | 18-42 | Increasing | SOD123 flat lead, SOT23 copper and SMA Flat lead 36-42 weeks lead time. Automotive parts 26-32 weeks | ||
STMicroelectronics | 20-33 | Increasing | TURBO 2 Ultrafast High Voltage Rectifiers running about 20 weeks. Everything else is 25-33 weeks. | ||
Fairchild | 12-14 | Stable | | ||
Diodes Inc | 12-16 | Increasing | | ||
Littelfuse | 16 | Increasing | Purchased ON Semi TVS business Lead times 24 weeks | ||
Vishay | 25-40 | Increasing | SMC at 25 weeks SMA and SMB at 40 | ||
STMicroelectronics | 8 | Stable | | ||
Diodes Inc | 12-22 | Increasing | | ||
Nexperia | 20-40 | Increasing | SOT23SD/DD from 20 to 45 weeks - SOD523 from 40 weeks - - SOT 89 40 WEEKS - SOT323SD/DD from 40 weeks SOT363 from 30 to 40 weeks SOT353P 20-40 WEEKS SOD123F 30 WEEKS DHVQFN14/16/20/24 from 12 to 24 weeks – DFN PACKAGES 20 weeks – SOD 323 26 WEEKS – SOT 223 40 WEEKS – DSN PACKAFES 20 WEEKS | ||
ON Semiconductor | 20-40 | Increasing | SMA 23-40 WEEKS – SMB 23-40 WEEKS – SMC 28-33 WEEKS – SOT 23 COPPER 20-45 WEEKS – SOT 89 16-30 WEEKS – SOT223 40 WEEKS – TO220 16-22 WEEKS – SOD 923 18-22 WEEKS – SOIC-8-14-16 20-30 WEEKS – SOD123 COPPER 20-30 WEEKS – SOD 323 DPAK 20-30 WEEKS – DFN PACK 20-52 WEEKS – SC 70 18-30 WEEKS | ||
Fairchild | 16-45 | Increasing | | ||
Switching Diodes | Diodes Inc | 12-22 | Increasing | | |
Fairchild | 16-45 | Increasing | | ||
ON Semiconductor | 16-40 | Increasing | SMA 23-40 WEEKS – SMB 23-40 WEEKS – SMC 28-33 WEEKS – SOT 23 COPPER 20-45 WEEKS – SOT 89 16-30 WEEKS – SOT223 40 WEEKS – TO220 16-22 WEEKS – SOD 923 18-22 WEEKS – SOIC-8-14-16 20-30 WEEKS – SOD123 COPPER 20-30 WEEKS – SOD 323 DPAK 20-30 WEEKS – DFN PACK 20-52 WEEKS – SC 70 18-30 WEEKS | ||
Nexperia | 20-40 | Increasing | SOT23SD/DD from 20 to 45 weeks - SOD523 from 40 weeks - - SOT 89 40 WEEKS - SOT323SD/DD from 40 weeks SOT363 from 30 to 40 weeks SOT353P 20-40 WEEKS SOD123F 30 WEEKS DHVQFN14/16/20/24 from 12 to 24 weeks – DFN PACKAGES 20 weeks – SOD 323 26 WEEKS – SOT 223 40 WEEKS – DSN PACKAFES 20 WEEKS | ||
Zener Diodes | Diodes Inc | 12-22 | Increasing | | |
Fairchild | 10-30 | Increasing | | ||
Nexperia | 6-40 | Increasing | SOT23SD/DD from 20 to 45 weeks - SOD523 from 40 weeks - - SOT 89 40 WEEKS - SOT323SD/DD from 40 weeks SOT363 from 30 to 40 weeks SOT353P 20-40 WEEKS SOD123F 30 WEEKS DHVQFN14/16/20/24 from 12 to 24 weeks – DFN PACKAGES 20 weeks – SOD 323 26 WEEKS – SOT 223 40 WEEKS – DSN PACKAFES 20 WEEKS | ||
ON Semiconductor | 12-40 | Increasing | SMA 23-40 WEEKS – SMB 23-40 WEEKS – SMC 28-33 WEEKS – SOT 23 COPPER 20-45 WEEKS – SOT 89 16-30 WEEKS – SOT223 40 WEEKS – TO220 16-22 WEEKS – SOD 923 18-22 WEEKS – SOIC-8-14-16 20-30 WEEKS – SOD123 COPPER 20-30 WEEKS – SOD 323 DPAK 20-30 WEEKS – DFN PACK 20-52 WEEKS – SC 70 18-30 WEEKS | ||
Vishay | 12-44 | Increasing | SMA SMB - 28-44 WEEKS | ||
Diodes Inc | 16-30 | Increasing | DFxx series 25-30 weeks, KBPxx series 21-25 weeks. | ||
Fairchild | 12-42 | Increasing | | ||
Vishay | 19-45 | Increasing | | ||
Diodes Inc | 12-22 | Increasing | | ||
Fairchild | 10-40 | Increasing | | ||
Nexperia | 13-40 | Increasing | SOT23SD/DD from 20 to 45 weeks - SOD523 from 40 weeks - - SOT 89 40 WEEKS - SOT323SD/DD from 40 weeks SOT363 from 30 to 40 weeks SOT353P 20-40 WEEKS SOD123F 30 WEEKS DHVQFN14/16/20/24 from 12 to 24 weeks – DFN PACKAGES 20 weeks – SOD 323 26 WEEKS – SOT 223 40 WEEKS – DSN PACKAFES 20 WEEKS | ||
ON Semiconductor | 12-40 | Increasing | SMA 23-40 WEEKS – SMB 23-40 WEEKS – SMC 28-33 WEEKS – SOT 23 COPPER 20-45 WEEKS – SOT 89 16-30 WEEKS – SOT223 40 WEEKS – TO220 16-22 WEEKS – SOD 923 18-22 WEEKS – SOIC-8-14-16 20-30 WEEKS – SOD123 COPPER 20-30 WEEKS – SOD 323 DPAK 20-30 WEEKS – DFN PACK 20-52 WEEKS – SC 70 18-30 WEEKS | ||
Rohm Semiconductor | 10-60 | Increasing | The following packages have been extended to 40 weeks CPT - TSMT356 - TSMT36M - TSMT8 - TSMT8M - SOP8 - UMD2M - USM - EMD2M - EMD2 - TUSH/TUMD2S - PMDU - PMDUM – PSM – PMDS - SSOP5 - SSOP6 | ||
PASSIVES | |||||
Trimmers & Pots | BI Tech | 8-12 | Stable | | |
Piher | 10-14 | Stable | | ||
Panasonic | 14-16 | Decreasing | Pots will be EOL by the end of 2017 | ||
Vishay | 10-14 | Stable | | ||
NIC Components | 18-20 | Increasing | Leadtimes pushed out. Some pricing has been increased. Pushouts some cases 40 weeks | ||
Nichion | 18-28 | Stable | SMD 10x10,8x10,6.3x7.7 Leadtimes coming down now between 18-24, Snap-in still 28-30, price increases happening | ||
Surge | 14-19 | Increasing | Lead-times pushing out closing on 20 weeks on some products | ||
Panasonic | 14-18 | Decreasing | Some SMD dropping from 18 to 16 weeks. Some price increases. | ||
United Chemicon | 16-20 | Increasing | Leadtimes increasing the 18-20 weeks | ||
AVX | 20-28 | Increasing | Long lead-times across all case sizes | ||
Vishay | 15-20 | Increasing | Lead-times extending on small case sizes A & B | ||
Leaded Capacitors - Ceramic | AVX | 18-20 | Stable | | |
Murata | 18-20 | Stable | A lot of parts EOL'd | ||
Vishay | 12-16 | Stable | | ||
NIC Components | 14-18 | Increasing | | ||
TDK | 14-20 | Increasing | | ||
Surface Mount General Capacitors – Ceramic | AVX | 24+ | Increasing | Automotive Specs Sold Out, Allocation on 44 series of parts. Controlled order entry on long list of parts | |
Murata | 20-38+ | Increasing | Controlled order entry on a long list of parts, mostly large case sizes. EOL notification on many parts | ||
Samsung | 24+ | Increasing | Lead times under pressure, price increases in Q1 2018 | ||
TDK | 24+ | Increasing | On severe allocation | ||
Taiyo Yuden | 30+ | Increasing | On severe allocation | ||
NIC Components | 24+ | Increasing | | ||
Yageo | 38+ | Increasing | Price increase in Q1 2018, Controlled order entry on long list of parts | ||
Walsin | 40+ | Increasing | | ||
Vishay | 16+ | Stable | |
Tel: (86) 769 8118 8110
Tel: (852) 8106 7033
Fax: (852) 8106 7099
E-mail: info@kingtronics.com
Skype: kingtronics.sales
MSN: kingtronics-sales@hotmail.com
Web: www.Kingtronics.com
YouTube: www.youtube.com/c/Kingtronicskt
Kingtronics International Company was established in 1995 located in Dongguan City of China to handle all sales & marketing for factories located in Chengdu, Sichuan and Zhaoqing, Guangdong, China. In 1990, we established the first factory to produce trimming potentiometer and in 1999 we built up new factory in Zhao Qing, Guangdong. Now with around 850 workers, Kingtronics produce trimming potentiometers, dipped tantalum capacitors, multilayer ceramic capacitors, and diode & bridge rectifier. We sell good quality under our brand Kingtronics, and Kt, King, Kingtronics are our three trademarks. All our products are RoHS compliant, and our bridge rectifier have UL approval. Please visit our Products page, you could please download all our PDF datasheet and find cross reference for our Trimming Potentiometer and capacitors.
Tantalum and Ceramic Capacitors Cross Reference ↓ Download
Diodes & Rectifiers List(PDF: 97KB) ↓ Download
Trimming Potentiometer Cross Reference ↓Download